Construction Begins!

Week 2: All the historical details we want to preserve are carefully removed and stored.

 

Then all the stucco comes down. We find two colonies of ants and other creepy crawlies that will have to find new homes.

Then the inside plaster comes down. The electricity is turned off, and down come the walls!

Finally, a stained glass specialists takes out the two angel windows for restoring.

 

Week 1: Work has begun to modify our vestibule and install a lift for accessibility. Don’t worry, all our historic details will be preserved.

Week one: Bushes were removed and three protective coverings were built, on the outside front, inside the Sanctuary, and inside the Parish Hall. The dumpster arrived and the sidewalk and steps were demolished.